Major vs. Minor Subdivides, What Every Land Investor Should Know

Blog Feature Minor Major Subdivides.jpg__PID:0e26970e-ca89-48b8-af4b-3f762ef54017

Subdividing land is one of the most powerful strategies in land investing. When you take one parcel, split it into multiple lots, and sell each lot separately, you can often create a large increase in value without needing to build anything. But here is the part many investors miss, not all subdivisions are created equal.

If you are actively investing in land, or you are thinking about it, you need to understand the difference between minor subdivisions and major subdivisions. These terms are more than categories, they define the entire experience of your deal, including your timeline, your approval process, your costs, and your risk.

This article breaks down what each type means, how each process typically works, what can derail your plans, and how to choose the right approach as a land investor.

What Is a Subdivide

A subdivision is the legal process of taking one parcel of land and dividing it into two or more lots that can be sold, transferred, or developed separately.

This is not simply drawing lines on a map, it is a legal change that requires the county to recognize new parcel boundaries and, in most cases, assign new parcel numbers. Depending on where your land is located, the approval process might be quick and inexpensive, or it might turn into a multi year development process.

The difference usually comes down to whether your project is classified as minor or major.

Why Major vs. Minor Matters to Investors

In the land investing world, subdivision strategy is all about time and cost. A minor subdivide can often be completed within months, sometimes with little more than a survey and a plat recording.

A major subdivide can require engineered plans, utility planning, new roads, and public hearings, which can stretch out for years. Knowing which category you are dealing with helps you answer the most important investor questions, including:

  • How long will this take
  • How much will it cost
  • How risky is it
  • How fast can I sell lots and get paid back
blog1.jpg__PID:ed2ffc3b-a56f-46e2-bac0-509e4fd6472d

Minor Subdivisions, The Investor Friendly Subdivide

A minor subdivision is the most common type of subdivision for rural land investors. It usually involves splitting one parcel into a small number of lots, without adding new roads, utilities, or infrastructure.

This is often where land investors find the best balance of upside and simplicity.

Common Traits of a Minor Subdivision

  • Lot count is small, often 2 to 4 lots, sometimes more depending on the county
  • No new road construction, lots typically use existing frontage or a shared easement
  • Limited county review, often administrative approval without public hearings
  • Faster timelines, commonly 2 to 6 months
  • Lower cost, often survey plus county fees
  • Less engineering, usually no civil engineer required
blog2.jpg__PID:bfede4ce-09ac-468c-926d-fe2a98ad1ad7

Minor Subdivide Steps, What the Process Usually Looks Like

Below is a simplified version of the minor subdivision process in most counties.

Step 1: Contact the county

Call the planning department and ask:

How many lots qualify as a minor subdivision here, what is the approval process, is there anything about this parcel that triggers extra review?

Step 2: Check the deal breakers early

Before spending money on a survey, verify:

  • Zoning allows your planned lot sizes
  • Minimum frontage requirements
  • Legal access for every future lot
  • Septic feasibility if there is no sewer
  • Any deed restrictions or HOA rules

Step 3: Create a basic concept layout

Sketch the split and confirm each lot meets minimum size, frontage, and access rules. A surveyor can often help you sanity check this quickly.

Step 4: Hire a surveyor

Your surveyor prepares the legal descriptions and plat map required for county review.

Step 5: Submit to the county

You submit the plat, application, and fees. Some counties require supporting documents such as driveway permits, access notes, or septic letters.

Step 6: Respond to revisions

Most counties request small changes, your surveyor updates the plat, and you resubmit.

Step 7: Record the approved plat

Once approved, you record it with the county. This is when the new lots become real.

Step 8: Get new parcel numbers and sell

After recording, the assessor issues parcel numbers, and now you can market or sell each lot individually.

Major Subdivisions, The True Development Process

A major subdivision is what you are dealing with when the project involves more lots, more infrastructure, and more county involvement. This often includes road building, drainage systems, utility planning, and multi step approvals.

Major subdivisions can be extremely profitable, but they operate more like development than land flipping.

Common Traits of a Major Subdivision

  • More lots, often 5 or more, but the threshold varies by county
  • Roads, utilities, or infrastructure required
  • Multiple approval phases, such as preliminary and final plat
  • Public hearings may be required
  • Environmental and drainage review is common
  • Longer timelines, often 1 to 3 years or more
  • Higher upfront costs, engineering, permitting, infrastructure, holding costs
blog3.jpg__PID:4b7fbd4e-56cb-4360-a435-5dd82bacdf9e

Minor Subdivide Steps, What the Process Usually Looks Like

A major subdivision involves more steps and more professionals.

Step 1: Pre application meeting

You meet with planning staff, present your concept, and confirm what studies, zoning issues, and infrastructure requirements apply.

Step 2: Feasibility checks and early planning

You evaluate big issues like:

  • Road layout and road standards
  • Utility availability and extension requirements
  • Drainage and stormwater management
  • Topography and grading
  • Flood zones, wetlands, habitat concerns
  • Soil quality for septic if needed

Step 3: Build your professional team

Most major projects require a surveyor and civil engineer at minimum, and may also require a land use attorney, environmental consultant, traffic engineer, or utility consultants.

Step 4: Submit preliminary plat

This is the first official submission and typically triggers review from multiple departments, including public works, fire, utilities, and environmental.

Step 5: Go through hearings and revision cycles

Some counties require planning commission hearings and public notices. This stage often includes repeated revisions.

Step 6: Permitting and infrastructure installation

This is where the money is spent. Roads, drainage, and utilities may need to be built or bonded before final approval.

Step 7: Submit final plat

After conditions are met, you submit the final plat for approval.

Step 8: Record final plat and begin sales

Once recorded, lots are legally created, and you can sell lots to builders or end buyers.

blog4.jpg__PID:d7fb7d9f-c0c8-4f14-9157-f4075b39c418

The Most Important Variable: Local Ordinances

Here is the truth, your county decides everything.

In one county, splitting into 5 lots might still be considered minor. In another county, splitting into 3 lots might trigger major review, especially if road access changes or new easements are required.

Before you close on any land you plan to subdivide, always check:

  • The county land development code
  • Subdivision ordinance definitions
  • Zoning rules and minimum lot size
  • Frontage and road access requirements
  • Whether the land is inside a recorded plat
  • Any overlay districts, such as floodplain or watershed protection
  • Deed restrictions, covenants, HOA rules

A simple call to the county can prevent months of delays later.

Common Problems That Turn a “Simple Split” Into a Nightmare

Even a minor subdivide can become a problem if the land has constraints. Here are the most common issues that slow down investors:

Access Issues

If lots are landlocked, or the parcel relies on questionable easements, the county may deny the split or require legal work.

Septic and Soil Limitations

Some counties require proof that each lot can support a septic system, especially in rural areas.

Flood Zones, Wetlands, and Environmental Review

Environmentally sensitive parcels may trigger extra review, even if the lot count is small.

Frontage Requirements

Some counties require each lot to have a certain amount of road frontage. If you do not meet it, you may need to build a road, which can shift you into major subdivision territory.

Zoning Mismatches

Your lot size plan must match zoning rules. Otherwise you may need rezoning, which adds time and hearings.

Final Thoughts

Subdividing is one of the cleanest ways to create value in land investing, but success depends on understanding what process you are actually stepping into. Minor subdivisions are ideal for investors focused on speed, simplicity, and repeatable profits.

Major subdivisions can lead to huge payoffs, but they require time, capital, and experience. Either way, your best investment is research, confirm the county rules, map out the steps before you buy, and make sure the numbers still work when the real timeline and costs are added in.

Want to Learn More About Subdividing Land

Chat with Land Advisor Blog Posts.png__PID:8ea6d9e5-8b83-4807-9cce-611f2a02eddb

Chat with a
land investing
advisor

Discuss any questions you have about land investing, our online community or courses! 

Schedule Now

We walk through real world examples of major and minor subdivides in our course and weekly newsletter, including case studies, deal breakdowns, and strategies you can apply immediately. Get started today.

Watch the Latest Podcast Episode Here: